BMWE energy transition study: Why the awarding of the contract is being criticized
Windräder und Solaranlagen: Wird ihr Ausbau verlangsamt? Unter anderem darüber soll die neue Studie entscheiden. (IMAGO / Jochen Tack)
The Federal Ministry of Economics has awarded the contract for the crucial energy monitoring to the EWI in a roundabout way. Both the contractor and the content of the contract have been criticized.